Screed Leveller Render

Find Solutions

FAQs

Do I need a primer before using LVL-25?

Yes, check LVL-25 Product Data Sheet for detail instruction for primer selection.

Can I lay SCR-100 direct to a concrete slab?

Concrete slabs must have a slurry/bond coat before laying SCR-100 Engineered Screed. We recommend a slurry coat on all substrates, including over WP-1. This helps lock in the screed. You can use ADH-55 mixed to slurry consistency for this purpose.

Can I use LVL-25 over existing tiles?

Yes, you can but you will need to use either PR-1 or EP-2 primers first. We also recommend grinding off the surface of the tiles. Full instructions can be found on the PDS.